The GP 80 is typically a contractorโs general purpose pump capable of delivering flows up to 34 litres per second and a maximum head of 24 metres. Used wherever thereโs a need for reliable automatic self-priming, the GP 80 incorporates the unique Sykes Univac vacuum system. This enables the pump to prime and re-prime fully automatically from dry. The GP 80 is powered by a 6.7kW Lister engine and is available on a robust 2 wheeled site chassis.
Feature
for continuous use
for robust applications
for simple redeployment
for swift functionality
for greater fuel efficiency
Performance | Max head:- 24 m [br] Max flow:- 34 l/s [br] Max solid:- 40 mm |
---|---|
Weight | 455 kg with fuel [br] 425 kg without fuel |
Dimensions (L x W x H) | 1700 x 1190 x 1093 mm |
Noise level | @ 1m = 95-98 dBA [br] @7m = 78 – 82 dBA |
Fuel capacity | 35 litres. Max 24 hours with cleaning and flushing facilities |
Pipe Connections | Suction:- 4" table D [br] Discharge:- 4" table D [br] Bauer couplings option:- 3" |
Fuel Consumption | Full load @ 1800 rpm:- 1.9 litres/hour |
Energy Efficient duty point | Fuel Consumption @ 1500 rpm:- duty point:- 0.61 litres/hour |
3″ SPLIT INTAKE
3″ 20FT W/A SUCTION HOSE BAUER
3″ 20FT POLYTUBE
3″ X 6M HELIFLEX PVC BAUER HOSE
3″ LAYFLAT HOSE PER METRE
3″ BLUE LAYFLAT X 25M CW BAUERS
3″ 90* BEND
3″ GATEVALVE
3″ NON RETURN VALVE
BUNDED FUEL TANK 1000 LITRE
RETAIL GAS OIL
DRIP TRAY 2440MM X 1525MM
DRIP TRAY 2058MM X 1525MM
ROAD RAMP C/W 6″ PN16 FLANGES
ROAD RAMP WIDE C/W 6″ PN16 FLANGES
Environmental
Emergency Pumping Services
Docks, Ports and Harbours
Refineries
Water and Waste Treatment
Local Authorities
Over-pumping
Offshore and Float Outs
Quarries and Mines
Building and Construction
Manufacture and Industry
Power Stations
Tunnelling
Construction projects
"*" indicates required fields
Use our simple Cooling and Heating Calculators to work out which of our products would suit your requirements best.
Oil
Full load @ 2000 rpm:- 0.71 litres/hour
15 l/s
Oil
Full load @ 1800 rpm:- 6.27 litres/hour
90 l/s
Oil
Full load @ 2500 rpm:- 1.4 litres/hour
15 l/s
Oil
Full load @ 1800 rpm:- 6 litres/hour
90 l/s
When the next heatwave strikes, will your workplace be ready โ or will your people, customers, and equipment be left
Across the entire hotel industry, one thing remains true: comfort is everything. Guests who sleep well, relax with ease, and
In 2025, staying cool has become a balancing act. With heatwaves hitting earlier, lasting longer, and becoming more frequent, retailers
Stay connected with Andrews Sykes and receive new blog posts in your inbox