Case Study: Warming hearts and facilities following school boiler breakdown
A fire left a specialist school in North Wales without heating or hot water. A 300kW hire boiler restored heat across the whole site within 24 hours, despite blocked access
Case Study: Temporary Cooling Keeps Major Televised Golf Event Running Smoothly
Discover how a tailored temporary event cooling package kept the media, broadcast and catering teams comfortable across every marquee at a major televised golf event.
Case Study: Reliable Cooling and Clean Air for the NHS Renal Unit During Summer Heat
Andrews Air Conditioning delivered a cost-effective temporary cooling and HEPA filtration solution for an NHS renal unit, helping keep dialysis patients comfortable during summer heat.
Case Study: Emergency Overpumping to Support Stormwater Main Replacement in South Yorkshire
Discover how Sykes Pumps delivered a rapid emergency solution beneath a live dual carriageway in South Yorkshire, using SH150 SS solids-handling pumps across a 300-metre bypass.
Case Study: Water Treatment & Dewatering Solution for a Major Infrastructure Project in the East Midlands
Zero non-compliant discharges. Zero programme delays. Discover how Sykes Pumps delivered construction dewatering and water treatment hire across a 3-year scheme.
Case Study: Sykes Pumps Prevents Quarry Flooding During Peak Winter Rainfall
Explore how a rapid-response dewatering strategy and the deployment of a high-head HP150 pump prevented operational shutdown, protected critical infrastructure, and ensured continued productivity during peak winter rainfall.