How Sykes Pumps Kept HS2’s M42 Box Project on Track
The M42 Box project in Birmingham is a key component of the HS2 high-speed rail network, involving installing 222 piles of 1500mm diameter driven to a depth of 35m to
Case Study: Delivering Crucial Cooling for Homerton Hospital
Homerton University Hospital in London is undergoing a significant refurbishment to enhance both its facilities and services. As part of this upgrade, the hospital’s old cooling equipment was removed
Bringing Ventilation Excellence to a Shopping Centre: A Case Study
During a significant internal renovation at a shopping centre in Carmarthen, Wales, the team here at Andrews Sykes was enlisted to deliver crucial ventilation solutions.
How We Rescued a Flooded Bedfordshire Block of Flats: A Case Study
In the picturesque county of Bedfordshire, a block of flats was grappling with severe damp and flooding issues. This was a result of ongoing roof problems that had led to
Case Study: Cooling Famous Cricket Ground in Nottinghamshire
A famous cricket ground in Nottinghamshire needed a rapid and effective climate control solution to quickly convert an indoor practice area into a functional and comfortable presentation space.
Andrews Air Conditioning – coming to a screen near you!
For the second consecutive year, our dedicated team of engineers has been invited to work on a highly acclaimed UK TV show. This repeat custom is a testament to the
What happened in Europe this month? – Valentine’s Edition
It’s the season of love, but we know that not everyone is a fan of Valentine’s Day. In some instances, self-care and personal growth must take priority. We’ve taken this
We knew last month had been a good one, but it has since come to light that it was our best December on record from a revenue perspective! Britain experienced
Winchester City Council enlists help of Andrews Boilers for leisure centre development
When a local authority in Hampshire faced the prospect of a major leisure centre development being delayed, a solution was required immediately to ensure the project was completed on time.
Air conditioning trinity cools uni building during student clearing process
You might expect the summer to be a quieter period for universities up and down the country, but that’s not entirely true. In fact, one of our major account customers
Sykes Pumps provides emergency pumping solution for house building contractor
At Sykes Pumps, we’re used to receiving last-minute callouts. Our ability to handle projects at short notice is the reason so many customers know they can rely on us when
Swift pump hire ensures sewage treatment maintenance project is completed months ahead of schedule
When one of the country’s largest sewage treatment plants reported an issue with their fixed pumps, they knew that Sykes Pumps could provide a suitable replacement pump hire package while
High capacity heating arrangement assists concrete curing process
Temperature can have a major effect on trade works, and it is important to take it into consideration before working with concrete during winter. This applies to both the ambient
Dehumidification hire salvages leisure centre renovation scheme
Andrews Sykes was recently contacted by a construction and restoration company requiring assistance with the refurbishment of a leisure centre based in Exeter. Suffering from severe water ingress and moisture