Medical research facility seeks huge cooling package for planned shutdown

Medical research facility seeks huge cooling package for planned shutdown

In order to manage a project efficiently, it is important that even the most seemingly insignificant details are considered before a solution is tailored. The one-size-fits-all ideology may suffice on smaller assignments but on bigger contracts with countless variables at play, this approach will almost certainly lead to complications further down the line.

Case Study: Air purification system protects the well-being of Post Office staff

Air purification system protects the well-being of Post Office staff

It has been well documented that facilities management companies are having to go the extra mile to keep their clients safe, with COVID directly responsible for big changes in most industries. A focus towards improving ventilation and increasing air changes within confined spaces has caused a significant upsurge in demand for equipment that can implement these safer conditions – something that Andrews has witnessed first-hand.

Digester boiler hire helps preserve energy output at sewage treatment plant

Digester boiler hire helps preserve energy output at sewage treatment plant

For many water companies, the annual electricity bill will exceed £1million per annum which renders it one of their most expensive operating overheads. The process of anaerobic digestion does however offer an alternative source of fuel, by converting sewage and other waste into a biogas that is used to generate renewable energy. In order for this to occur, the digester itself must reach a certain temperature for bacteria to produce the gas.

Integrated heater and dryer arrangement helps client overcome water ingress issue

Integrated heater and dryer arrangement helps client overcome water ingress issue

A recent study conducted by a construction insurance company has revealed that water damage is the second most common cause of loss or delays on UK building projects. Water ingress is an issue that has blighted developments for decades, underlining the importance of astute risk management and contingency plans as and when something does go wrong.

Heater hire cuts screed drying times to keep building project on track

Heater hire cuts screed drying times to keep building project on track

Now more than ever, construction companies are under great pressure to complete building projects on time and ensure that any potential causes of delay are quickly addressed. One of the most common reasons for deadlines being pushed back is a need for screed to dry properly, which can lead to developments grinding to a halt and prevent labourers from accessing the impacted areas.

Stand-in pump hire replacement keeps MOD pumping station online

Stand-in pump hire replacement keeps MOD pumping station online

Towards the end of summer, Sykes was contacted by a utility contractor working on behalf of a Ministry of Defence site in Lincolnshire. Our client was looking for a temporary solution to be installed as a replacement for units located in a pumping station on site. The customer’s existing pumps required routine maintenance and so had to be decommissioned to enable them to be attended to.

Sykes helps global courier roll out fire protection solution at all locations worldwide

For many years, Sykes Pumps has provided an international parcel logistics company with a temporary pump hire solution to allow annual maintenance of fire pumps at their flagship premises in Heathrow. So, when our client was planning to undertake routine upkeep of their pumps and pipework during the autumn, we were confident in our ability to deliver suitable replacement equipment and ensure that a fire protection solution was on standby. With no room to compromise on safety, our engineers visited site to reassess the job and ensure that a critical fire suppression application could be correctly installed. It was recommended by Sykes’ regional expert that two diesel driven HP100 high performance pumps were used, and these were delivered to site at a pre-arranged time. There were two separate warehouses requiring a stand-in fire protection system, with an HP100 pump deployed at the entrance of each. Both pumps were situated outside the building and connected to an external fire hydrant which was in turn connected to an indoor sprinkler system. Each pump drew water from a 30,000-litre tank parked on the forecourt, ensuring that the required water capacity would be immediately available in the unlikely event of a fire. Interestingly, until recently our client had previously only utilised this type of fire protection solution at their training base in Heathrow. However, there are now plans for them to replicate this arrangement across all of their warehouses – including overseas. The simplicity with which Sykes Pumps demonstrated that back-up fire protection pumps can be installed has played a huge part in the company’s change of policy and a testament to the professionalism of our technicians throughout this project. View full case study

Heating arrangement delivers warmth and air changes to Charlton Athletic’s temporary gym

Heating arrangement delivers warmth and air changes to Charlton Athletic’s temporary gym

With gyms and sports facilities obliged to undertake a series of updated precautions following the relaxation of blanket lockdown restrictions, operators have been forced to adapt in order to keep their customers safe. A legal requirement to implement one-way systems, introduce frequent cleaning of all machines and apparatus and ensuring that people are more spread out has led to additional space being needed in many instances.

International restaurant chain heated by Andrews hire package

International restaurant chain heated by Andrews hire package

At Andrews Heat for Hire, we understand the obligation of companies operating in the food industry to keep their guests sufficiently warm throughout the winter season.

So when a famous international restaurant suffered a heating failure at one of their chains in Middlesbrough, our specialists were on hand to provide them with an instant temporary solution.

Case study: Air purification system makes office environment safer for staff

Air purification system makes office environment safer for staff

In the current times, businesses are going to greater lengths to improve the indoor air quality of their premises wherever possible. It is widely accepted that air quality can have a significant impact on the health and performance of employees, with companies now actively taking precautions to intercept everyday pollutants and reduce the risk of virus transmission.

Overpumping systems bypasses sewer mains on hotel grounds

Before a hotel could reopen for business following a change in ownership, the new management team had to address an outflow of sewage that had been streaming over a footpath on site for the previous few months. Prior to the hotel changing hands, the building was left derelict and the sewage connection to the mains had been disconnected by the local water company. Understandably, this was an issue that our client wanted addressed with pressing urgency as it was costing them money every day the hotel was unable to open. Plans had been drawn up for a new main to be laid over the coming months but in the meantime, it was essential that an overpumping hire solution could be found. A Sykes Pumps salesperson visited the site to assess the situation and to calculate the required overpumping distance. Two Piranha S21 submersible wastewater pumps were subsequently recommended because of their ability to handle effluent and small solids. These were installed utilising the customer’s power supply and fitted with telemetry and more than 120 metres of 2” discharge hose in order to bypass the live sewer and reach the designated discharge point. Since being installed, our pump hire arrangement has worked continuously for several weeks and will remain in place until the new main has been constructed. For additional peace of mind, we also provided the customer with a standby attendance package in which an engineer will immediately be sent to site in the unlikely event of a problem. View full case study

Andrews provides office canteen with drying rental solution following flood

When burst pipework at a large Fleet Street office building caused a communal canteen area to flood, the mechanical services company responsible for the premises contacted us in search of some hired drying equipment. Although the damaged pipework had been addressed, there were concerns that the subsequent flooding could affect the interior’s surfaces unless restoration could begin immediately.

Luxury department store seeks flood recovery hire solution

Luxury department store seeks flood recovery hire solution

At Andrews Dehumidification, we pride ourselves on having an aptitude for providing tailored drying solutions to a wide range of issues – whether planned or emergency. Our reputation as industry leaders has seen us work alongside big names from most industries, including one of the retail sector’s most iconic department stores in London. The client contacted us out-of-hours towards the end of lockdown after a plumbing issue inside their store had caused water to leak onto the shop floor. Although the damaged pipework was quickly addressed to stem the outflow of water, our customer was unsurprisingly concerned about the impact it could have on their business given that the store was due to reopen the following week. Sensing the customer’s desperation, our regional expert proposed a dehumidification hire solution over the phone to accelerate the response time and allow kit to be in position later that day. Having been given the dimensions of the affected retail space, we were able to recommend the deployment of eight FD40 DV dryers which are specifically designed for flood recovery scenarios. Despite receiving the enquiry on a Saturday evening, our team worked together to ensure that the required units could be collected from our depot, delivered to site and installed before 10pm. Our equipment remained almost constantly in operation for five days, allowing moisture to be extracted and all carpets and surfaces to be completely dried before the end of the working week. By reacting as quickly as we did, we were able to guarantee to our client that their store would be ready to reopen its doors to the public – and it duly was. The facilities team expressed their gratitude to Andrews Sykes for our swift turnaround and admitted that without us, there would have been a delay in returning to business. Download Case Study

Emergency air conditioning hire allows TV gameshow to continue filming

Emergency air conditioning hire allows TV gameshow to continue filming

Although record-breaking temperatures have been well-received by some sections of society, the hot weather has also been hugely inconvenient to many people and business sectors – including the broadcasting industry.

Andrews Air Conditioning has a longstanding track record of working with TV studios, on film sets and related applications, establishing an excellent reputation for delivering climate control solutions without affecting the action unfolding in front of the cameras.