Sykesโ P 2001 Series submersible drainer pumps are designed for use on general dewatering applications. Ideal for moving nuisance water, they are commonly deployed in a broad range of environments e.g. construction, utilities, mines and quarries, shipyards, docks and industrial sites to ensure projects remain on schedule. These 3/4โ pumps are available in three versions with flow rates up to 44 L/sec and a maximum Head of 45 metres. P 2001 units are very robust and are compatible for use with a 3 phase 415V power supply. Low maintenance features enable trouble free uninterrupted use over long periods.
Feature
for high abrasive resistance
and suitable for long-term use
with high flow and high head versions available
allows smooth running and constant flows
so can be positioned quickly
reduces the risk of damage
provides fast and easy operation
so fits small spaces
Model | P2001 N / NP2001 H / HP2001 V |
---|---|
Motor type | 415V |
Motor rating | 5.8 kW / 5.8 kW / 4.8 kW |
Max power input | 6.8 kW |
Running current | 12A |
Discharge spigot | 3" or 4" Bauer |
Dimensions (H x W) | 686 x 364mm |
Weight (excl cable) | 50kg |
PLC2000/SP50 LEVEL CONTROL
VARIABLE PANEL 1KW TO 15KW
3″ 20FT W/A SUCTION HOSE BAUER
3″ 20FT POLYTUBE
3″ X 6M HELIFLEX PVC BAUER HOSE
3″ LAYFLAT HOSE PER METRE
3″ BLUE LAYFLAT X 25M CW BAUERS
3″ 90* BEND
3″ GATEVALVE
3″ NON RETURN VALVE
4″ X 3M W/A BAUER HOSE
4″ 20FT W/A SUCTION HOSE BAUER
4″ 20FT POLYTUBE
4″ X 6M HELIFLEX PVC BAUER
4″ LAYFLAT HOSE PER METRE
4″ BLUE LAYFLAT X 25M CW BAUERS
4″ X 6MTR STEEL BAUER PIPE
4″ 45* BAUER BEND
4″ 90* BEND
4″ GATEVALVE
4″ NON RETURN VALVE
SETTLEMENT TANK
SYKES SILT AWAY
ROAD RAMP C/W 6″ PN16 FLANGES
ROAD RAMP WIDE C/W 6″ PN16 FLANGES
ROAD CROSSING C/W 8″ PN16 FLANGES
Construction
Emergency site drainage
Docks & Shipyards
Clean and dirty water pumping
Tunneling
Industrial
General dewatering
Mines & Quarries
Utilities
Power Generation
"*" indicates required fields
Use our simple Cooling and Heating Calculators to work out which of our products would suit your requirements best.
Electric
110V (1-Phase) 50Hz / 240V (1-Phase) 50Hz / 415V (3-Phase) 50Hz
1.3 kW / 1.3 kW / 1.4 kW
Electric
240V (1-Phase) 50Hz / 415V / 415V
1.7 kW / 2.2 kW / 2.2 kW
When the next heatwave strikes, will your workplace be ready โ or will your people, customers, and equipment be left
Across the entire hotel industry, one thing remains true: comfort is everything. Guests who sleep well, relax with ease, and
In 2025, staying cool has become a balancing act. With heatwaves hitting earlier, lasting longer, and becoming more frequent, retailers
Stay connected with Andrews Sykes and receive new blog posts in your inbox