The GP50/75 is the smallest general purpose pump in our expansive hire range but retains all the features of our larger GP units. This 2” pump can also be used as a 3” version and has been specifically designed to be a ‘first on site’ solution in the event of an emergency. Small, compact and robust, our GP50/75 unit is perfect for a multitude of environments including construction, utilities and civil engineering. The unit incorporates the unique Sykes Univac vacuum system and is capable of automatic priming and re-priming automatically from dry, maximising efficiency and reducing running costs.
Feature
for continuous use
for robust applications
for simple redeployment
for swift functionality
for greater fuel efficiency
for swift delivery
Performance | Max head:- 28 m [br] Max flow:- 15 l/s [br] Max solid:- 28 mm |
---|---|
Weight | 200 kg with fuel [br] 188 kg without fuel |
Dimensions (L x W x H) | 1216 x 750 x 860 mm |
Noise level | @ 1m = 90 – 97 dBA [br] @ 7m = 73 – 80 dBA |
Fuel capacity | 14 litres. Max 24 hours with cleaning and flushing facilities |
Pipe Connections | Suction:- 3" BSP Female thread [br] Discharge:- 2" BSP Female threadBauer couplings option 2" |
Fuel Consumption | Full load @ 2500 rpm:- 1.4 litres/hour |
Energy Efficient duty point | Fuel Consumption @ 1500 rpm 0.58 litres/hour |
2″ SPLIT INTAKE
2″ 20FT W/A SUCTION HOSE BAUER
2″ X 6M HELIFLEX PVC BAUER HOSE
2″ LAYFLAT HOSE PER METRE
2″ BLUE LAYFLAT X 25M CW BAUERS
2″ BLUE LAYFLAT X 50M CW BAUERS
2″ 60* BEND
2″ GATEVALVE
2″ NON RETURN VALVE
RETAIL GAS OIL
Environmental
Emergency Pumping Services
Docks, Ports and Harbours
Refineries
Water and Waste Treatment
Local Authorities
Utilities
Quarries and Mines
Building and Construction
Manufacture and Industry
Power Stations
Tunnelling
"*" indicates required fields
Use our simple Cooling and Heating Calculators to work out which of our products would suit your requirements best.
Oil
Full load @ 1800 rpm:- 3.7 litres/hour
45 l/s
Oil
Full load @ 1800 rpm:- 1.9 litres/hour
34 l/s
Oil
Full load @ 1800 rpm:- 6.27 litres/hour
90 l/s
Oil
Full load @ 1800 rpm:- 6 litres/hour
90 l/s
When heatwaves hit, opening a window and switching on a fan just won’t cut it. UK workplaces, schools, and event
When the next heatwave strikes, will your workplace be ready – or will your people, customers, and equipment be left
Across the entire hotel industry, one thing remains true: comfort is everything. Guests who sleep well, relax with ease, and
Stay connected with Andrews Sykes and receive new blog posts in your inbox