Andrews dehumidification were asked to provide a scheme for maintaining humidity and temperature levels during a critical period when specialist coatings were being applied to newly built concrete tanks on a water treatment plant.
After our initial survey by one of our experienced team a detailed scheme was presented to the client. Desiccant dehumidifiers together with thermostatically controlled electric heaters were used to maintain the required relative humidity and temperature requirements.
The solution provided was key to the clients completion of phase one on time and that success insured winning the contract for phase 2 and 3 of the project.