Case Study: Andrews Chillers Keeps Sterile Centre Operating 24/7 After Cooling Failure

Maintaining precise temperature control is non-negotiable in healthcare environments. In sterile services centres, even the smallest fluctuation can compromise sterilisation processes, disrupt operations and put compliance at risk.

When cooling systems fail, facilities must act immediately. This is where temporary chiller hire, emergency cooling solutions and rapid-response engineering support become essential.

Andrews Chillers successfully delivered a high-capacity cooling solution to keep a sterile services centre fully operational following a critical cooling failure.

Cooling Failure in a Critical Environment

Sterile services centres operate under strict environmental conditions where precise temperature control is essential. Without consistent cooling being delivered to air handling units (AHUs), stable internal temperatures cannot be maintained.

When the on-site cooling system failed, the facility immediately required an emergency cooling solution to prevent:

  • Disruption to sterilisation processes
  • Non-compliance with healthcare standards
  • Operational downtime impacting essential services
  • Increased pressure on staff working in a high-risk environment

Maintaining uninterrupted performance was critical, as even a short lapse could impact both workflow and patient safety.

The site required a fast, reliable and scalable temporary chiller hire solution that could integrate seamlessly with existing infrastructure.

The Solution: 250kW Fluid Chiller

Following a rapid site assessment, Andrews Chillers engineers implemented a temporary cooling solution using a 250kW Fluid Chiller.

The system was installed externally and configured to supply chilled water directly to the facility’s AHUs. This ensured that temperature-controlled air continued to circulate throughout the sterile services environment.

The 250kW Fluid Chiller is specifically designed for applications where reliability and performance are critical, particularly in healthcare and hospital environments such as sterile services centres. Its ability to run efficiently under continuous demand made it the ideal choice for this sterile services cooling application.

250kW Fluid Chiller
High capacity 250kW cooling outputDelivers consistent cooling to large-scale facilities
Continuous 24/7 operation capabilityOperates continuously without performance degradation
Seamless integration with existing AHU systemsCan be deployed rapidly in emergency situations  
Robust design for demanding healthcare environmentsMaintains strict temperature tolerances required for sterilisation

The success of this installation has reinforced confidence in Andrews Chillers’ equipment and expertise, with the site continuing to rely on our services for future requirements.

Long-Term Reliability from a Temporary Solution

The sterile services centre continued operating in full compliance with regulatory standards, with no disruption to critical workflows.

What began as a temporary solution quickly proved its long-term value.

  • The unit has remained on site for over a year
  • It continues to operate reliably under 24/7 conditions
  • Performance has consistently met operational demands
  • The solution has exceeded expectations in both efficiency and reliability

Once operational, the chiller delivered immediate and stable cooling, restoring environmental control across the facility.

Download Case Study

Download Case Study: Andrews Chillers Keeps Sterile Centre Operating 247 After Cooling Failure

Need Temporary Chiller Hire or Emergency Cooling?

Andrews Chillers provides:
  • Temporary chiller hire
  • Emergency cooling solutions
  • Healthcare-specific cooling systems
  • Free site surveys and expert consultation

If your facility requires reliable cooling support, our team is ready to help, speak to our specialist today!
Call 0800 211 611 or visit andrews-sykes.com

FAQs

Can your Andrews Chillers operate continuously?

Yes, our chillers are designed for continuous 24/7 operation, ensuring reliable performance in critical environments where uninterrupted cooling is essential.

What size chiller do I need?

The required chiller size depends on your facility’s cooling load, space and application. Our engineers carry out a site survey to recommend the most suitable and efficient solution.

Contact our specialist today on 0800 211 611 or use the enquiry form to discuss how we can help.

How reliable are your temporary cooling solutions?

Reliability is at the core of our service. All equipment is regularly maintained and tested, and our engineers provide ongoing support, including monitoring, maintenance and 24/7 engineering assistance to ensure consistent performance throughout the hire period.

Continue Reading