Posts Tagged ‘Supersilence’

New Appointment in International Business Development for Andrews Sykes

Wednesday, September 1st, 2010

Ian Atkinson

Building on years of successful operations within existing core markets, Andrews Sykes has now appointed Ian Atkinson to implement a new international growth strategy to further diversify geographical demand of the business.

Ian has 15 years experience in working with international distributors and international key accounts - specialising in fleet management within the industrial equipment sector. Initially, Ian will focus his efforts on renewing local support and business development activities for the existing international distributor network.  He will also appoint new distributors to boost further our business in core regions such as MEAF.

While, there will be a systematic regional growth focus, Andrews Sykes also encourages pro-active enquiries from any international potential partners who believe they can offer a complementary strategic fit with our product range and who are also committed to building a successful sales and hire model for any of our business lines.

A comprehensive launch program will be implemented with each new distributor, supporting them in building sustainable sales and hire revenue models for our premium range of equipment.

For further information, please contact international@andrews-sykes.com

Sykes Pumps Help The Residents of Brentford

Friday, August 13th, 2010

pump-brentford-floods1

Thousands of people in west London were left without water and up to 60 homes were flooded when a mains pipe burst. Sykes Pumps were on site within 3 hours of the call from Thames Water Contractor, pumping water with one of our GP 150M HATZ Silenced Pumps. Supplies to homes and businesses in Hounslow, Chiswick and Twickenham were affected when the pipe in London Road, Brentford, broke early in the morning. Thames Water said work to fix the pipe could take 48 hours and repairs to the road surface could take up to a week.

Sykes Pumps Emergency Cover Prevents Flooding

Thursday, July 1st, 2010

Sykes Pumps Pump Hire

Sykes Pumps received a call recently from the control room of a major sewage treatment works to report a serious danger of flooding of the facility. Due to very heavy rainfall during the night the main pumps on the site were unable to cope with the conditions and the ensuing high demand, which put the site in serious danger of flooding.

Sykes Pumps regional Technical Engineer, reported to the site to assess the situation and advise how Sykes Pumps could help solve the situation. After liasing with the manager at the local Sykes depot, it was decided that more than one depot would need to assist to avert the potential risk; Sykes’ depot management staff mobilised engineers and delivery vehicles from two locations, delivering a total of 6 no. 6” diesel pumps complete with hoses and accessories to site immediately. Once installed Sykes Pumps engineers attended site on a daily basis checking that the equipment was operating correctly and no further risk to the facility occurred.

Sykes Pumps Launches New Scrappage Scheme

Wednesday, April 28th, 2010

Sykes Pumps Scrappage Scheme

As the government has ended its initiative to get older cars off the road in exchange for new, more efficient models, Sykes Pumps are delighted to launch our very own Scrappage Scheme for previously purchased 4” and 6” Sykes pumps.

Created for anyone looking to upgrade their current Sykes unit, our new Scrappage Scheme lets owners trade in their current 4” or 6” Sykes pump for a new SUPER WISPASET super silenced unit offering better efficiency, lower engine emissions, higher performance and an environmentally friendly fully bunded unit.

Anyone wishing to take up this unique opportunity to upgrade their pump should contact Phil Parker or Bob Young on 0800 0856938 for full details.

Emergency Call Out to Sewage Treatment Works

Monday, August 24th, 2009

A sewage treatment works called Sykes Pumps early on Sunday morning due to their main site pumps not able to cope with the heavy rainfall over the weekend. Both Basildon and Charlton depots were in a position to help the Sewage Treatment Works avert the potential risk of the facility flooding.

Seven of Sykes 8” diesel pumps were onsite within 2 hours of the initial call and installed by experienced engineers in under 3 hours. As sole supplier to several water companies, Sykes Pumps are excellently positioned to supply a wide range of pumping solutions to assist Sewage Treatment Works in removing excess water from the plant. A 4 hour guaranteed response time to any call out providing peace of mind that Sykes Pumps can provide the peace of mind and customer service that are second to none.

Sykes Pumps - 8" Diesel Super Silence Pump

Sykes Pumps - 8" Diesel Super Silence Pump