Posts Tagged ‘LPHW BOILERS’

New Appointment For Chiller & Boiler Division

Friday, June 10th, 2011

Alan Smith

Andrews Sykes the UK’s largest specialist hirer is pleased to announce that Alan Smith has been appointed UK Business Development Manager for Andrews Chiller and Boiler Hire Division.

Alan has over 15 year’s experience in working in the specialist hire arena, having specific expertise in Chiller Hire and Boiler Hire markets.

Carl Webb (Andrews Specialist Hire Divisional Director) commented “bringing Alan into the team demonstrates the continued investment within the division. With Alan’s knowledge and experience he provides an ideal fit for Andrews Sykes.”

Alan Smith added “When the opportunity to join Andrews Sykes came along it was such an easy decision to make. Andrews Chiller and Boiler Hire are the market leaders in the industry. I join at a very exciting time and I am looking forward to being involved in the future development and success of the business.”

The Best of British Boiler Hire

Friday, January 7th, 2011

Boiler Hire

Andrews Boiler Hire  have taken delivery of 20 new British built boilers into their ever expanding hire fleet. The 500kW and 100kW Boiler hire units are the quietest and most energy efficient Boiler Hire units on the market, ”these units lead the way in power efficiency and in the reduction of noise emission, the 500kW Boiler and the 100kW Boiler are capable of  a leaving water temperature as high as 90 Deg C, and can provide Central Heating and Domestic Hot Water simultaneously, service and general maintenance is minimal and installation and commissioning of the units  can be completed in 2 hours”. Dennis Gwynne (Technical Director) Both units are supplied with multi-staged burners which can run on Diesel, Biodiesel or Natural Gas and can reduce fuel consumption by up to 30% . For more information visit www.Andrews-Sykes.com

Supermarket’s Heat

Monday, December 20th, 2010

Heating System

After a failure of the central heating boilers in a major supermarket, an emergency call was received by Andrews Boiler Hire for the supply of a temporary boiler unit and Air Handling Units to provide heated air for the customers and staff. A qualified Andrews Specialist Hire Technical Engineer was on site within 4 hours of the call to asses the feasibility of a temporary Heating System . After discussions with the store manager a 500kW Boiler  coupled to 10 x 60kW Air Handling Units, was delivered, installed and commissioned (outside of opening times) to maintain trade. For more information visit www.andrews-boilers.com

Process Heating On Demand

Monday, July 13th, 2009

After failure of the main steam system at a Pharmaceutical company Andrews Specialist Hire Division was contacted to design, install and supply a packaged boiler system to overcome the loss of production. Andrews supplied a LPHW (Low Pressure Hot Water) system to supply hot water at 95 Deg C by use of the twin heat exchanges within the temporary boiler (exclusive to Andrews Sykes). The system was designed so that localised hot water could be used whilst the main boiler plant was being repaired, this negated the requirement of large expensive temporary steam units. For more information visit www.andrews-sykes.com

Process Boiler

Underfloor Heating For Rugby League

Friday, February 27th, 2009

Andrews Boiler Division supplied 2 x 500kW Boilers for a Premier Rugby League club during the cold snap. Andrews Boilers were contacted after the main system failed 2 days before the premiership clash. The boilers where delivered and installed the same day and the pitch was defrosted within 24 hours. Andrews supplied the complete package including hose, bunded tanks, circulation pumps and a complete fuel management system. For more information visit www.andrews-sykes.com

Underfloor Boiler Heating

Hot Water and Heating For Prisons

Wednesday, February 11th, 2009

After a failure in the hot water and heating boilers in a prison, an emergency call was received by Andrews Sykes Nottingham for the supply of a temporary boiler unit. A qualified Andrews Specialist Hire Technical Engineer was on site within 4 hours of the call to asses the feasibility of temporary Heating and Hot Water . After discussions with the clerk of  the works a 250kW Boiler capable of Heating and Hot Water simultaneously, was delivered, installed and commissioned with no disruption to the prison services. For more information visit www.andrews-boilers.com

LPHW Boiler