United Kingdom

Glasgow

99 Bogleshole Road
Cambuslang
Glasgow
G72 7DD

Location Details

Situated a stone’s throw away from the River Clyde, our Glasgow depot is approximately 5.5 miles south-east of the city centre and lies almost parallel to the M74 motorway. The warehouse itself is positioned on a very prominent site on the roundabout of the Cambuslang Road. Baillieston Interchange is nearby and provides connectivity to the M73 and M8 serving central Scotland. The nearest railway station - Cambuslang - is just 0.8 miles away, and a ten minute walk from our modern premises.

We offer a full range of services from our Glasgow depot, including air conditioning hire, pump hire, chiller hire, heater hire, boiler hire, dehumidifier hire and ventilation hire. As the UK’s leading supplier of specialist equipment, we deliver round-the-clock assistance throughout Glasgow, Lanarkshire, Dunbartonshire and Argyll, including: Paisley, East Kilbride, Hamilton, Ayr, Kilmarnock, Airdrie, Stirling, Dumfries and Dumbarton.

The depot is served by more than a dozen full-time members of staff, including hire supervisors, technicians and delivery drivers. Of our four Scottish-based depots, Glasgow is the largest and spans almost 47,000 square feet. It stores equipment for all purposes and seasons throughout the year, with four-hour delivery to your location guaranteed. Customers can also park on our site and collect small units directly from us if necessary.

At Andrews Sykes, we appreciate that the requirements of our clients differ from company to company. That’s why we endeavour to gain a better understanding of your needs and processes in order to provide a befitting solution. Call now on 0141 9542241 for a free site survey or to discuss in detail how we can best assist you.

How to find us

From Glasgow City Centre, head towards the M8 from St. Vincent Street and then merge onto the motorway via the slip road to Greenock/Glasgow Airport/Kilmarnock. Continue on the M8 to West Street, then use the left two lanes to exit at junction 20. From here, use the left lane to turn onto West Street and then merge onto the M74 after half a mile. Continue for 2.7 miles and then exit onto Cambuslang Road at junction 2. At the roundabout, take the first exit. After 0.3 miles, turn onto Bogleshole Road.

If travelling from Paisley or surrounding areas, head north-east on Gallow Green Road towards the M8. Once on the M8, proceed for 4.5 miles and then use the left two lanes to take the M74 exit towards Carlisle. Keep right to continue on the M74 for another 3.5 miles, and then exit onto Cambuslang Road at junction 2. Merge onto Cambuslang Road/A274, taking the first exit at the roundabout. Turn left onto Bogleshole Road.

Those heading from Hamilton should head east on Wellhall Road toward Union Street, before using the left lane to merge onto the M74 via the slip road to Glasgow/Stirling. Stay on the M74 for the next 4.7 miles, then take the A74 exit to Tollcross/Rutherglen. Continue on Fullarton Road, then then take the second exit onto Cambuslang Road. At the roundabout, take the second exit onto Bogleshole Road.

Local Projects

Queensferry Crossing

We supplied a huge pump hire package to the Queensferry Crossing bridge construction designed to connect Lothian and Fife.

Glasgow County Council headquarters

Andrews Air Conditioning was asked to provide a temporary cooling solution during the summer months for Glasgow County Council’s offices in George Square.

Scottish Water pipework fitting in Paisley

A large contractor working on behalf of Scottish Water required two 12” silenced pumps to help construct a new pipe network in Paisley.

Building drying in Dumfries

Six 60kW indirect fired heaters were hired to a national contractor in Dumfries in order to help dry a newly-constructed building.

Server cooling in Lanark

When a multinational information technology firm shipped a large number of servers to Scotland, they contacted us to supply the necessary cooling to keep the technology in storage. Following a site survey, we delivered and installed a 500kW chiller as well as fans to ensure the servers were kept at the required temperature.

TV set in Glasgow

A client contacted us following an urgent requirement to cool a set which, due to warm weather at the time, was too hot to work in. We visited the premises and within a couple of hours had several PAC22 air conditioners and fans operating on site.

Hospital in East Kilbride

We were approached by an international construction company to provide temporary heating for a new hospital in the area. Following a site survey, we deployed eight high capacity heaters along with associated ducting and fuel tanks over the winter period.

Wind farm in Eaglesham

A new major wind farm - the second largest in Europe - required our intervention in order to pump out water collected in holes designated for the turbines. We delivered several diesel pumps as well as various lengths of hosing with strict time constraints, enabling more than 200 turbines to be erected within schedule.

Prison in Shotts

Initially, an infrastructure developer asked us to provide a number of super silenced pumps to be used while groundworks was carried out. The customer then required several large heaters to ensure all four wings of the prison were sufficiently warm.

Hire categories

Explore our hire categories

Explore our diverse range of hire categories to discover even more options for your needs.