Blog - Page 68
Facilities Management company seeks urgent air conditioning
Sykes Pumps assist with ballasting process on the River Tees
A heavy transport company specialising in the movement of burdensome loads required our assistance for a large-scale project
Indoor shop cooling
Just how hot is it in Brazil?
Simulation of holiday village heating system ensures future operation
Andrews pen new two-year deal with Charlton
Plymouth city centre ice rink
A Winter Wonderland based in the heart of Plymouth City Centre was in conjunction with the council, offering free ice skating to schools in the deprived areas. The project was
Andrews Chillers salvage industrial production line
Art gallery in Manchester requires climate control
An international construction services company contacted us regarding the hire of heaters, dehumidifiers and fans, which were needed to control the temperature and moisture levels of an art gallery in
UPS room in the Shard needs cooling
Temporary heating for London fashion house
Graduation ceremony requires temporary cooling
Chiller Preserves Products In Warehouse
English and Dutch depots play annual fixture at The Valley
Andrews Sykes competition at Facilities Show in June
Data centre sources temporary cooling via facilities manager
A data centre in Gloucestershire expanded their data capacity by adding additional data banks to one of their existing sites. The mandatory temperature needed to ensure the servers kepts working
Case Study: Replacement of R22 refrigerant permanent units
During the shutdown of a distribution warehouse for a major food retailer, a project was planned to swap all R22 refrigerant out of their permanent units. This was ordered by
Heating supply for a hospital X-ray room
Subscribe to our Newsletter
Stay connected with Andrews Sykes and receive new blog posts in your inbox
