Blog - Page 22
Distinguished London hospital seeks heater hire for COVID testing and vaccination centres
Since the coronavirus outbreak, Andrews has worked alongside the NHS on a national scale to provide a range of essential HVAC services. Initially tasked with supplying comfort cooling in hospitals,
Infrastructural development reliant upon bespoke dewatering solution
Long-term customer requests our drying expertise on school development
Building contractor enlists the help of Sykes Pumps on renovation contract
Emergency boiler installation prevents relocation of the elderly and infirm
Andrews Sykes agrees season-long partnership with Hibernian FC
Case Study: Eleventh-hour chiller hire ensures the show goes on at London’s Lyceum Theatre
Last month saw a very poignant relaunch of the eternally popular The Lion King musical, following a difficult year for theatregoers and the arts industry in general.
Independent festival in Hampshire seeks help from Sykes Pumps
When a music festival in Winchester required a solution for a complicated waterfall flow, Sykes Pumps Hire were approached
British kitchen manufacturer seeks ventilation for new warehouse fit-out
Sykes Pumps Hire provide emergency pumps for Salmon Farm
Sykes Pumps Hire was recently approached by a salmon farm in the Lake District, with the client requiring a solution to prevent and monitor low water supply.
Sykes installs over-pump arrangement to facilitate vital repair works
Sykes’ pump hire experts were recently called into action after a building contractor got in touch looking for a solution
Andrews assists lead contractor on Bank Tube station reconstruction project
The £700m upgrade of one of London’s most recognised Underground stations is expected to be completed by spring 2022
Heater keeps patrons warm at trendy London pop-up food and retail park
Wiltshire-based demolition contractor requires pumps for dust suppression
Telecoms manufacturer requests dehumidification solution on long-term hire
Event organisers hire air conditioning for technology exhibition in London
Case Study: Yorkshire university hires temporary heating and air quality control systems
After 18 months of social isolation and disruption to the education sector, we’re now seeing institutions across the country take action to ensure the wellbeing of students and lecturers
Case study: Andrews scales dizzy heights with hospital chiller hire
Subscribe to our Newsletter
Stay connected with Andrews Sykes and receive new blog posts in your inbox
