Emergency Overpumping to Support Stormwater Main Replacement in South Yorkshire
Discover how Sykes Pumps delivered a rapid emergency solution beneath a live dual carriageway in South Yorkshire, using SH150 SS solids-handling pumps across a 300-metre bypass.
Water Treatment & Dewatering Solution for a Major Infrastructure Project in the East Midlands
Zero non-compliant discharges. Zero programme delays. Discover how Sykes Pumps delivered construction dewatering and water treatment hire across a 3-year scheme.
Case Study: Precise ballasting keeps 3,000-tonne modules on schedule on the River Tyne
Moving ultra-heavy assets onto a barge demands more than capacity. It calls for careful control of trim and list, plus timing that respects tight tidal windows. When a major North
Case Study: No off season for our chillers and boilers โ Andrews Sykes provides temporary climate control for a consultancy firm
No matter the time of year, there is no off season for our chillers and boilers! When a major consultancy firm in central London was stripping out their existing heating
Optimise concrete batching temperatures with customised boiler solutions
Concrete batching is the process of mixing the ingredients of concrete to produce a hardened form in predetermined shapes and sizes at batching plants.
Andrews Air Conditioning โ coming to a screen near you!
For the second consecutive year, our dedicated team of engineers has been invited to work on a highly acclaimed UK TV show. This repeat custom is a testament to the
Andrews Sykes provides cooling solutions for critical medical amenities
At Andrews Sykes, we take great pride in providing first-class chiller hire services to our valued clients. Recently, we received a call from a hospital based in North London, which