Case Study: Four-storey office provided with emergency air conditioning hire
A leading facilities management company in Scotland was recently tasked with providing emergency cooling for one of their biggest clients, following the untimely breakdown of their internal chiller system.
Case Study: Andrews provides Hampshire hospital with emergency cooling
When a high-profile hospital located in Hampshire contacted Andrews Air Conditioning Hire in search of some emergency cooling equipment, our expert team stepped in to ensure the requirement was met.
Andrews provide emergency cooling for British Prime Minister
Andrews Air Conditioning Hire were recently contacted to provide a temporary cooling solution for a very high profile meeting between some of the country’s leading political figures.
Case Study: World famous confectionery company seek air conditioning hire
When a world famous confectionery company suffered air conditioning failure, an immediate solution was required to safeguard all storage rooms against the heat. Fortunately, our depot is situated just miles
Case Study: Andrews Air Conditioning cool healthcare facility kitchen
In a healthcare environment, where people are already unwell, it is absolutely imperative that patients’ food is stored correctly to prevent them suffering any further illness. Rising temperatures in Scotland
Case Study: Commercial television regulators kept cool during summer
Sometimes, even recently constructed modern buildings can find themselves unprepared for extreme weather when it arrives. This was exemplified during the summer of 2016, when one of the country’s broadcasting
Case Study: Facilities manager seeks cooling for office and server room
With temperatures in London beginning to rise ahead of a hectic bank holiday weekend, it was essential that a large office building and accompanying server room were suitably protected by
Case Study: Andrews Air Conditioning aid successful broadcast of James Bond Spectre premiere
With the new James Bond movie now hitting cinema screens across the UK, box office predictions have tipped the film to gross close to $1billion by the end of 2015.
Case Study: Specialist educational institution in London requires cooling
With temperatures in the capital regularly approaching 30°C during August, it was perhaps unsurprising that demand for climate control solutions soared. So when a dedicated drawing school in Hackney required