Andrews dry concrete flooring at tarmac company warehouse
Before concrete can be laid during the winter period, a series of precautions must be taken to ensure the composition sets correctly. When outdoor temperatures are low, concrete naturally sets
Andrews Heat for Hire aid construction of new London school
Low ambient temperatures during the finishing stages of a building can cause problems for a contractor, while frost can damage delicate materials and a slow drying process may delay an
Andrews accelerate screed drying process for student accommodation
Before a floor surface can be applied to a newly developed building, it is common practice that screed is laid onto a concrete base. Typically made up of one part
Case Study: World-famous London tourist attraction kept operational by Andrews
As one of the country’s most frequently visited tourist spots, the Tower of London’s climate control arrangements face much scrutiny should customers complain about its perceived ineffectiveness. So when a