Case Study: Specialist educational institution in London requires cooling
With temperatures in the capital regularly approaching 30°C during August, it was perhaps unsurprising that demand for climate control solutions soared. So when a dedicated drawing school in Hackney required
Chiller hire simplifies concrete mixing for Olympic Stadium construction
Andrews Chiller Hire has for many years, worked on some of the UK’s biggest construction projects creating bespoke cooling solutions. We understand how important deadlines are to developers, whether it
Andrews Air Conditioning Aid the Ministry of Defence
The typical British summer is defined by one or more heatwaves followed by stormy weather. When dealing with an uncertain climate it can prove expensive to buy air conditioning units
Experimental Laboratory Require An Andrews Dehumidification Hire Tailored Solution
A research laboratory located in Leicester needed to carry out special tests - at a cold temperature - using a newly developed data gathering robot. The experiment took place in
When handling X-ray films in areas of high humidity, it is crucial to provide dehumidification to prevent any excessive moisture causing irreversible damage. High humidity can promote mould growth and
Case Study: Beverage factory in need of Andrews Air Conditioning
Workshops are generally filled with machinery and production lines which all tend to heat up the enclosed space. When the temperature reaches unbearable levels it can be difficult for staff
Andrews Air Conditioning provide cooling for car showroom
Showrooms tend to have large areas of glazing and low-pitch ceilings. Together these features encourage heat increase on sunny days, even while the temperature outside is not extreme.
A hotel is not a simple business to run. Constant reviews from professionals and clients can leave your business with a reputation, be it good or bad. Andrews Air Conditioning
A Winter Wonderland based in the heart of Plymouth City Centre was in conjunction with the council, offering free ice skating to schools in the deprived areas. The project was