Andrews dry concrete flooring at tarmac company warehouse
Before concrete can be laid during the winter period, a series of precautions must be taken to ensure the composition sets correctly. When outdoor temperatures are low, concrete naturally sets
Andrews Heat for Hire aid construction of new London school
Low ambient temperatures during the finishing stages of a building can cause problems for a contractor, while frost can damage delicate materials and a slow drying process may delay an
International steel manufacturer saved six-figure sum
Andrews Dehumidification has helped one of Europeโs largest steel producers save a staggering ยฃ120,000 this winter, after providing them with a tailor-made drying arrangement. The steelworks had previously sought assistance
Andrews accelerate screed drying process for student accommodation
Before a floor surface can be applied to a newly developed building, it is common practice that screed is laid onto a concrete base. Typically made up of one part
Emergency boiler replacement keeps major IT consultant functional
When a boiler breaks down or loses effectiveness, a rapid response to the issue will help keep your building operational. Failure to address the situation quickly can have far-reaching implications
Swift intervention from Andrews Dehumidification Hire saves international food producer thousands
Once a potato yield has been gathered, it is absolutely imperative that all produce is stored appropriately in order to maximise its shelf life. A potatoโs high moisture content makes