Case Study: Andrews Chiller Hire assists with the production of the world’s most popular high-speed diesel engines
One of the world’s leading aeronautical engineers encountered a major problem with their production line when their cooling system lost productivity. As a result, Andrews Chillers were contacted and asked
Andrews provide heating hire solution for one of the UK’s best-known bakers
Andrews Heat for Hire recently responded to an emergency call from one of the UK’s best-known bakers. The company sought to raise temperatures inside a temporary warehouse to assist with
Dryers help to restore conditions for leading food distribution company
When a leading food distribution company suffered a leak in their storage building, a significant quantity of frozen goods, beverages and other products were immediately at risk. The client –
Andrews Dehumidification Hire provide tailored drying solution
When one of the world’s largest independent cancer charities began building their new headquarters in Cambridgeshire, the project itself fell behind schedule. The primary issue centred around drying times, but
Andrews provide ventilation hire for road improvement works
When a major construction company had been contracted to resurface one of London’s busiest roads, Andrews Ventilation Hire were required to ensure all appropriate safety measures were taken.
Andrews provide emergency cooling for British Prime Minister
Andrews Air Conditioning Hire were recently contacted to provide a temporary cooling solution for a very high profile meeting between some of the country’s leading political figures.
Tailored chiller hire preserves fruit for UK’s largest farming and dairy company
When rising summer temperatures left one of the UK’s largest farming and dairy companies exposed to the risk of losing all of their fruit produce, Andrews Chiller Hire were contacted
Andrews Ventilation Hire assist with 'mega shed' construction project
One of the country’s most prestigious universities was in the process of building a new ‘mega shed’ which was due to be used as a large library facility. Once completed,