22 Jan
An Andrews Heat for Hire Aurora FH 2000S installed externally, with black ducting routing warm air into a Surrey film studio.

Case Study: Andrews Heat For Hire Rescues a Major Surrey Film Set In Under 4 Hours

When a heating failure threatened a major Surrey film studio at 5 pm, Andrews Heat for Hire deployed an FH2000
12 Jan
Two heavy-duty Andrews Ventilation extraction fans connected to flexible ducting for continuous smoke removal.

Case Study: Andrews Ventilation Delivers Fume Extraction for High-Profile London Event

Discover how our centrifugal smoke extraction fans kept fire pits safe and compliant.
10 Dec
High-performance AP103 Air Purifierair cleaner deployed in a hospital ward.

Straightforward ventilation hire becomes dual-purpose healthcare solution

True resilience in healthcare means having equipment that adapts to the unseen challenges.
10 Nov
High Performance pump with heavy-duty hoses supplying primary flow for film set water circulation.

Behind the Scenes: Sykes Pumps Help Bring Film Magic to the Screen

On active film sets, our priority is to control circulation without turbulence, using equipment quiet enough to protect live sound
20 Oct
DE 95 360 Case Study Web Post

Rapid, Energy-Efficient Heating Keeps Retail Trading Thanks to Andrews Heat for Hire

Combining innovation with sustainability, Andrews Heat for Hire continues to lead the way in modern, energy-efficient heating technology.
29 Sep
Sykes Pumps Silt Away system with chemical dosing and monitoring equipment used for lake dewatering and water treatment in a West Sussex quarry.

Reliable Dewatering Solution and Safe Water Treatment from Sykes Pumps

A major project is under way in West Sussex. The silted lake is being emptied, treated, and safely discharged into
18 Aug
Ballasting system ensures safe, on-time load-out at Tyne shipyard

Precise ballasting keeps 3,000-tonne modules on schedule on the River Tyne

Moving ultra-heavy assets onto a barge demands more than capacity. It calls for careful control of trim and list, plus
31 Jul
Innovative Rooftop Setup in Central London

No off season for our chillers and boilers – Andrews Sykes provides temporary climate control for a consultancy firm

No matter the time of year, there is no off season for our chillers and boilers! When a major consultancy
7 Jul

Overpumping Solution from Sykes Pumps on Major Sewage Treatment Works 

During critical maintenance work on penstocks at a sewage treatment facility in Leicester, a major task prevailed: ensuring the uninterrupted

27 Jun

Sykes Pumps Assists in Dewatering Operations for New South East Reservoir Construction 

A new Oxfordshire reservoir, South East Strategic Reservoir Option (SERSO), is under way, creating a major new investment in water

23 Apr

On-Set Dust Control with FV900 for Coffee Advert: A Case Study

When a major coffee company began filming a new television advert at an indoor studio location, their creative concept required

21 Apr

Delivering Reliable On-Set Heating for Apple TV Series

When a globally streamed Apple TV series began filming across multiple UK studio locations during the winter, maintaining a warm

3 Mar
How Sykes Pumps Kept HS2’s M42 Box Project on Track

How Sykes Pumps Kept HS2’s M42 Box Project on Track

The M42 Box project in Birmingham is a key component of the HS2 high-speed rail network, involving installing 222 piles
18 Oct

Delivering Crucial Cooling for Homerton Hospital: A Case Study

Homerton University Hospital in London is undergoing a significant refurbishment to enhance both its facilities and services. As part of
29 Sep
A West Sussex library faced a significant challenge when its boiler heating system was scheduled for replacement with a ground-source heat pump.

How We Kept a Library Warm & Open During Boiler Replacement: A Case Study

A West Sussex library faced a significant challenge when its boiler heating system was scheduled for replacement with a ground-source
2 Sep

Bringing Ventilation Excellence to a Shopping Centre: A Case Study

During a significant internal renovation at a shopping centre in Carmarthen, Wales, the team here at Andrews Sykes was enlisted
23 Aug

How We Rescued a Flooded Bedfordshire Block of Flats: A Case Study

In the picturesque county of Bedfordshire, a block of flats was grappling with severe damp and flooding issues. This was
13 Aug

Cooling Famous Cricket Ground in Nottinghamshire: A Case Study

A famous cricket ground in Nottinghamshire needed a rapid and effective climate control solution to quickly convert an indoor practice
16 Nov
100kW-boiler

Emergency boiler hire helps avert patient relocation at healthcare facility

As a repeat customer, Andrews’ local expert had an excellent understanding of the application based on previous visits and so
19 Sep
Keeping an electric car showroom cool with temporary air conditioning

Keeping an electric car showroom cool with temporary air conditioning

When a leading supplier of Uber's electric vehicles in London needed cooling for their new showroom, traditional HVAC solutions
23 Aug

Our cooling solutions safeguard healthcare samples

The summer has been busy for Andrews Air Conditioning. Despite the peak in demand, our engineers ensure that every job

Subscribe to our Newsletter