The 1,000 kW site boiler is one of our largest units and offers a quick and easy hot water solution to a range of applications including district heating systems, construction sites, healthcare facilities and process plants. The unit can be sited and connected to an existing arrangement quickly to restore hot water in any environment. Incorporating a 2-stage burner to conserve fuel and reduce emissions, this particular model can be fully functional within minutes of arriving on site and is fuelled by gas oil. Delivery via a Hiab vehicle negates the need for a crane on site while the unit’s quiet operation renders it perfect for deployment in noise-sensitive areas.
Feature
and hot water for a variety of applications
supplementary use or complete replacement
3-phase 415 V power supply for simple set-up
to existing systems for quick installation
during planned maintenance
for multitude of environments
discreet deployment
up to 1.25mW achievable
| Nominal heating duty | 1,000 kW |
|---|---|
| Power supply | 415 V 3 ph N+E 50 Hz Run 17 A |
| Plug type | B54343 5 pin 32 amp |
| Noise level (max) | 48 dBA / 62 LWA @ 10 metres |
| Weight | 7,500 kg |
| Dimensions (L x W x H) | 6058 x 2438 x 2591 mm (without flue) |
| Fuel type | Gas Oil / IHO / Natural Gas |
| Control | Automatic thermostat |
| LPHW connections (flow / return) | 100 mm DN100 PN16 flange |
| Power consumption | 4.1 kW/h |
| Fuel consumption: Winter average heating | 45.0 l/h |
| Fuel consumption: Summer average heating | 30.0 l/h |
| Fuel consumption: Peak average heating | 80.0 l/h |
"*" indicates required fields
Use our simple Cooling and Heating Calculators to work out which of our products would suit your requirements best.
Gas
300 kW
3.1 kW/h
Gas
250 kW
20.0 l/h
Gas
300 kW
24.0 l/h
Electric
150 kW
300 kW
Electric
150 kW
300 kW
Oil
32kW
620 m³

Stay connected with Andrews Sykes and receive new blog posts in your inbox