At Sykes Pumps, we take pride in providing top-quality pumping solutions to our customers across various industries. Recently, we had the privilege of working with a construction company on a dewatering project in Howden.
The challenge
The customer required a reliable and efficient dewatering solution to clear standing water from their site and redirect it to the main drain off-site. This was crucial to ensure a safe and productive working environment for their team.
Our solution
To meet the company’s needs, we supplied two Super Wispaset 100 pumps, complete with two 1000-liter external fuel tanks. Our experienced team conducted a thorough pre-delivery inspection at our Doncaster depot, ensuring the pumps were in optimal condition before deployment. On the day of installation, our expert technician was on-site to position the pumps strategically and connect the fuel lines from the external tanks to the pumps. This seamless installation process ensured that the dewatering operation could commence without delay.
Thanks to the reliable performance of our pumps, the customer was able to effectively clear the standing water from their site, allowing them to maintain a safe and productive work environment throughout the project’s duration.
Sykes Pumps, we are committed to delivering exceptional service and top-quality pumping solutions to our customers. Whether you require dewatering, overpumping, or any other pumping application, our team of experts is ready to assist you.
To learn more about our comprehensive range of pumps and services, visit our website or call our dedicated call centre at 0800 211 611