Case Studies

23 Jul
Major beverage producer kept functional by Andrews Chillers

Major beverage producer kept functional by Andrews Chillers

As with virtually any form of production, there are stringent control standards in place to protect consumers and ensure that
16 Jul
Hotel hosting training courses kept cool during summer

Case Study: Hotel hosting training courses kept cool during summer

With temperatures for much of June far warmer than they have been in previous years, there has been a prevalent
14 Jul

Sykes Pumps launches new Minivac eco pump

13 Jul
Andrews Sykes engineers installing climate control equipment for a major Belgian TV broadcaster.

Case Study: Industry-leading IT firm rescued by Andrews Air Conditioning

1 Jul

Case Study: Andrews Chillers aid power station closure

The United Kingdom’s sustained effort in finding environmentally-friendly energy sources has played a crucial role in the closing of power
9 Jun

International firm kept functional by Andrews Chillers

29 May
Delivering reliable dewatering solutions: A case study with a construction company

Sykes Pumps assist major weir reconstruction

When the brickwork of a weir in Kent was scrutinised by local health and safety authorities, the Environment Agency ordered
22 May

Sykes Pumps help alleviate traffic on busy A road

20 May

Andrews Chiller Hire preserves output at anaerobic digestion plant

5 May

High water table threatens to bring bridge construction to a standstill

1 May

British poultry farm hires temporary drying system

28 Apr

Sykes Pumps dewater lake at London angling club

22 Apr

Conversion of water recycling centre kept on track by Sykes Pumps

When Anglian Water opted to swap thermal dryers for an HPH advanced digestion system at their recycling plant in Grimsby,
10 Apr

Southern Water pumping station kept operational

7 Apr
Air Purification Solution for Education

Case Study: Andrews Boilers assist leading UK university

Having provided schools, universities and similar institutions with boiler services and temporary equipment over a number of years, we are
31 Mar

Waste food recycling plant seeks heating solution

By naturally breaking down organic materials into methane and carbon dioxide, biodegradable waste can be converted into fuels
27 Mar

Temporary arena in London requires replacement heating

With cold weather in the capital threatening to mar a series of parties scheduled during the run-up to Christmas, an
25 Mar

London station seeks emergency intervention after flooding

24 Mar

Andrews Dehumidification keep furnishing project on schedule

20 Mar
Heating Solutions for Public Sector & Government

Case Study: World-famous London tourist attraction kept operational by Andrews

As one of the country’s most frequently visited tourist spots, the Tower of London’s climate control arrangements face much scrutiny
11 Mar

Sykes Pumps assist petrol station construction

Subscribe to our Newsletter

Stay connected with Andrews Sykes and receive new blog posts in your inbox