An international broadcaster headquartered in the Middle East needed the intervention of Andrews Sykes before moving into new offices in London. The Shard – Europe’s tallest freestanding building – was their location of choice, but an overheating issue threatened to obstruct the moving in process.
The main UPS switch room – which provides the company with a back-up power supply – was getting too hot, and this problem had to be addressed before occupancy could begin. We provided the client with a PAC 60 portable air conditioner complete with heat exchanger and accessories, to reduce the internal temperature. By removing warm air from the vicinity, we prevented critical materials and equipment from being exposed to dangerous amounts of heat.
Having provided a cooling solution to this customer before, they approached us knowing we would respond quickly to the problem at hand. We supplied the same units for a previous project so our client was satisfied with our system, which ensured the switch room remained at a safe temperature.