theatre show

Empty theatre gets a makeover with the help of our industrial dehumidifier hire and heating

After sitting empty for more than 30 years, an old theatre began renovations to bring it back to life. The contractors faced a challenge – the ceiling work needed strict temperature and humidity control in order for it to set properly. The work areas required 15-20°C temperatures and tight regulation of relative humidity.

Immediately after the initial call, a site survey was quickly arranged for the next day. In addition to the ceiling, comfort heating and material protection would be critical in other areas like the office and foyer. Regular surveys followed over the coming weeks, as the project’s complexity demanded tight coordination of power and logistics.

read more

Andrews comes up with golden ticket for Charlie and the Chocolate Factory stage show

A few weeks ago, the team at Andrews Sykes once again demonstrated our ability to provide exceptional service when faced with a critical situation during the famous Charlie and the Chocolate Factory theatre show.

On a Sunday evening, we received an urgent call from the stage manager, who was concerned about rising temperature levels backstage posing a potential risk to the children performing. The weekend prior, the show had to cancel two performances due to the scorching heat on the stage. It was evident that immediate action was needed to ensure the show could go on. And thanks to us, it did!

read more