hs2 development

Andrews Sykes receives positive feedback across different industries!

No matter the environment, Andrews Sykes ensures all customers across all sectors are met with professionalism.

When heavy rains brought sudden flooding, we received an urgent call from a loyal customer needing emergency equipment. Despite the last-minute notice, our team immediately shifted into crisis response mode. We know that during flooding, every minute counts.

We swiftly coordinated with our engineers in the local depot location to organise flood kits that included heaters, dehumidifiers, and ventilation fans. In the meantime, our delivery driver safely raced to collect them. Our driver navigated adverse conditions to deliver the units just two hours after the initial call came in.

read more

Our latest HS2 Viaduct ventilation project

The deafening sound of jackhammers and welding torches echo through the dimly lit tunnel below the Colne Valley Viaduct, which stretches for approximately two miles between Hillingdon and the M25. Sparks fly as construction crews work tirelessly on the generational HS2 project that will soon connect London to Birmingham.

Our team has been brought in for a critical mission – to provide proper ventilation that will keep hundreds of site workers breathing easy. Four of our high-capacity FV1800 units were rushed to the site on Monday, with their adjustable airflows and amperage rendering them perfect for this particular purpose.

read more