High capacity heating arrangement aids hotel building fit-out
With a new hotel in Croydon said to be just a few months away from opening, the construction company responsible for the project turned to us for a temporary heating solution. Their requirement stemmed from the need to complete the interior fit-out as quickly as possible, which was being made more difficult by the unfavourably cold conditions.
Our client had arranged for various sub-contractors to visit the location and undertake timber works, joinery, plastering and floor laying, so it was critical that the temperature and humidity levels of the building were conducive to these tasks.