Andrews Heat for Hire aid construction of new London school
Low ambient temperatures during the finishing stages of a building can cause problems for a contractor, while frost can damage delicate materials and a slow drying process may delay an overall project. Raising the temperature too quickly can also cause surface cracking as the materials shrink, meaning conditions must be closely controlled to prevent complications arising.
The fit-out phase of a new school in London therefore required external assistance during the winter period, with Andrews Heat for Hire drafted in to provide the necessary equipment. A local expert then visited the site to gain a better understanding of the application in question, before proposing a heater hire package that would fulfil the needs of a major client.