Sewer works in Reading kept online by Andrews Chillers
When one of the country’s largest sewage plants suffered mechanical failure on their processing site, a swift reaction was vital to ensure an environmental health hazard was avoided. Circulation pumps – which push waste water through the works – had begun to falter, and this was attributed to the hot summer weather.
If the sewage wasn’t treated properly it would cause an outflow into the river nearby and have the potential to cause far-reaching damage. An immediate solution was therefore required.