Historic bathroom retailer requires urgent boiler replacement
When one of the UK’s oldest bath manufacturers underwent a major site revamp, a serious construction error left premises without hot water and heating. It was intended for parts of the factory deemed surplus to requirements to be carefully demolished, but workmen on the site inadvertently cut through a gas main while carrying out this process.
Although our client was downsizing on a fairly significant scale, there were still several people based in the building who were dependent on this basic facility being provided. At this juncture, Andrews Boilers were contacted with a solution desired as quickly as one could feasibly be installed.