Andrews provide replacement boiler following breakdown
In an attempt to accommodate ever-increasing demand for affordable housing in East London, several local authorities ordered the construction of extra properties in its surrounding areas. However, problems arose when the newly-built houses were added to a district heating system that was already operating close to capacity.
The circuit had been overexerted for several months and as a consequence, three separate 100kW modules broke down under the strain. It was therefore imperative that these were taken offline for servicing and replaced by an adequate alternative.