As part of a £1 billion regeneration scheme north-west of Birmingham, Sykes Pumps were contacted by a national civil engineering company in charge the project. A complex land reclamation plan had been drawn up which was dependent upon a long-term hire arrangement to ensure it could proceed as planned.
Three GP150 and two GP100 pumps were therefore provided, as well as two 3” Submersible units and a power generator. These were installed on site within a few days of the requirement being brought to our attention, and are expected to remain in place for between six and eight months.
Having worked with the client several times in recent years, they were confident of our ability to recommend pumps for an extremely specialist construction job. All units were delivered and set up within a short turnaround time, helping the wider project keep to what is undoubtedly a critical schedule.