When a boiler loses effectiveness, a rapid response to the issue will ensure your building remains operational. So when a hospitals estates department had a boiler failure, they put in an urgent call to one of our specialists.
Due to the age of the boiler, our client was expecting to wait up to 4 weeks before obtaining a part vital to the repair of the boiler. The swift intervention of Andrews Heat for Hire was therefore essential.
Our solution was to propose a heater hire package consisting of two ID65 indirect fired heaters, positioning them alongside the hospital building and ducting the warm air in through windows over three floors.
Once our customer was pleased with the advised temporary heating solution, engineers were sent to site to complete installation. Failure to address this situation quickly would have resulted in major implications for the hospitals everyday businesses.