Case Study

Andrews provide FM company with chillers for university construction project

When one of the top universities in England required extra cooling for one of their buildings, Andrews Chiller Hire was on hand to help.

Our client was undergoing major renovation works inside their music department, and in doing so were required to remove and relocate all existing equipment from the building. The temporary rooms had to be kept at a constant temperature in order to preserve the condition of the equipment, and so our chiller specialists were drafted in to recommend an effective temporary cooling solution.

Following a same-day site survey conducted by on one of our local experts, our solution was to provide the customer with a 50kW temporary chiller combined with air handling units. The units were commissioned for use within hours of our arrival, allowing the University to maintain desired conditions inside the music room.

We ensured the temporary cooling solution maintained maximum effectiveness throughout the planned renovation works, providing the client with effective climate control which enabled all music courses to continue without any disruption.

View full case study