This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Case Study
Andrews Heat for Hire responds to hangar boiler failure
An airport located in the South East was forced to find a temporary solution following the disastrous failure of their ageing boiler system. Temporary equipment was urgently required to keep workers warm and ensure the continuous running of daily operations until a permanent boiler replacement could be sourced.
The size and scale of the average hangar makes them notoriously difficult to heat in a cost-effective manner, as pointed out by the client. Essentially, they were looking for a short-term source of heating that could deliver large volumes of warm air economically while their boiler system was out of action. Large numbers of people work inside the hangar each day, ranging from mechanics, transport staff, strategists and cleaners. The working environment is therefore extremely important, with low temperatures a potential safety issue.
Having assessed the application at close quarters, our regional engineer recommended the installation of an Aurora FH111 indirect fired heater. The unit was deployed external to the hangar, with lengths of 18” ducting fed into the building to ensure large volumes of warm air were circulated inside. A single Aurora FH111 unit has the capacity to heat areas of up to 2,440m³, which was the approximate size of the hangar in this case. This heater is one of the most economical units of its kind available on the hire market and can operate at 92% fuel efficiency when running at full capacity.
Once set up on site, the client was extremely pleased with the impact of our heater hire package which kept indoor temperatures warm despite the challenges posed by doorways constantly opening and closing. The hire lasted for a total of 10 weeks and only came to an end once an alternative boiler unit was installed.