Blog5 March 2014

Andrews Chillers aid warehouse conversion

A well-known construction firm in Thurmaston recently completed work to convert empty warehouse space into a functioning chilled storage area, in order to accommodate surplus stock during the Christmas period. Andrews Sykes were tasked with providing the necessary equipment to transform the warehouse into a chilled store. The solution to the problem involved delivering and installing six Fast Chill 90 units – complete with relevant cabling and pipework – to ensure the desired temperature could be achieved.

Andrews Chillers Hire‘s quick response meant that on the first day of the project, a 5 degree differential from the temperature outside had been accomplished. Interestingly, our client had previously used a large competitor but sought an alternative to keep costs lower.

With the broadest array of equipment and an unrivalled contingency service, any requirements can be accommodated. In this instance, the customer proved to be very satisfied with the service provided.