Case Study

Andrews Chiller Hire assists with the production of the world’s most popular high-speed diesel engines

One of the world’s leading aeronautical engineers encountered a major problem with their production line when their cooling system lost productivity. As a result, Andrews Chillers were contacted and asked to install a temporary chiller system that would enable the production of engines to remain consistent with normal output levels.

Following an assessment by one of our qualified engineers, our solution was to provide a chiller hire package which consisted of a 200kW Fluid Chiller, a plate heat exchanger and a circulation pump – in order to restore functionality to the customer’s existing cooling system.

This quick turnaround provided by our specialists meant we were able to help our customer maintain desired temperatures throughout the various stages of production.

Our client was extremely impressed with our quick response which played a pivotal role in guaranteeing the plant remained online and kept the production of the world’s most popular high-speed diesel engines fully operational at all times.

View full case study