Case Study

Andrews Boilers provide tailored heating hire solution for medicine society

By understanding the implications of heating failure and the implications it might have on a corporate event, Andrews Boilers are determined to move quickly and restore this vital provision to ensure the reputation of our customer is never tarnished.

So when one of the country’s senior medical education bodies suffered a complete breakdown in the build-up to their biggest event, Andrews Boilers were called in at short notice and asked to provide a suitable boiler hire solution.

The lack of available space made it difficult for us to deliver and install a 100kW boiler. However, our experts were able to recommend the use of five 22kW temporary electric boilers, which could be fitted discreetly out of hours and ensure our client still had the required heating and hot water capacities.

The impact of not installing a temporary boiler unit would have resulted in the closure of the building until a replacement had been installed. Instead, our quick response helped supersede an ineffective boiler system and keep the entire premises warm without causing any disruption to event preparations.

View full case study