Andrews Ventilation Hire assist with ‘mega shed’ construction project
One of the country’s most prestigious universities was in the process of building a new ‘mega shed’ which was due to be used as a large library facility. Once completed, the university say the site will hold the equivalent of 18 Olympic swimming pools’ worth of books – underlining the application’s size!
As part of the construction process, various industrial equipment was utilised for concrete slab pouring which could have left an enclosed space polluted with carbon monoxide. This would have had serious health implications for those working on site if the issue was not addressed quickly, but our engineers were on hand quickly to ensure this problem was averted.