![]() |
![]() |
|||||
|
Associated Case Studies
PROCESSES - AEROSPACE When a leading aerospace company won a contract from a major European airline to refit new jumbo jets and older aircraft, it needed reliable warmth. Two of these giant aircraft arrive at the same time, with a fast turnaround required. Although the company has big heated hangars, their slots were sometimes busy, so jumbos had to be refitted on a ramp using an outside dock. Work had to continue 24-hours no matter how low night-time temperatures fell. Andrews provided four ID175 heaters to protect aircraft interiors and components, Ducting piped warmth through the aircraft windows enabling engineers to work. |
|
|
||||