Case Study

Andrews provide boiler hire solution for popular international hotel

Failure to provide effective climate control in a hotel environment – particularly during the winter months – can ruin the experience of guests and tarnish a hotel’s reputation. So, when a popular international hotel experienced an unexpected boiler failure, our specialists were required to provide an emergency boiler solution.

The hotel in question is among a chain of full-service hotels and resorts known for winning awards for customer satisfaction – underlining the importance of us recommending and delivering equipment to site quickly.

After visiting site, our experts recommended a 250kW packaged boiler which was then connected to the client’s existing heating circuit via a series of temporary hoses. This was commissioned for operation within 24 hours of the original phone call despite the scope for delays during the busy festive period.

The short-term boiler hire proved to be an extremely effective solution and ensured visitors were provided with heating and hot water throughout their stay, allowing the hotel to keep their world-class reputation intact.

View full case study